Rīga's Hydrogen Station Needs a Green Upgrade, Not a Goodbye
Rīgas satiksme is turning to battery buses, while its hydrogen station still runs on natural gas. Switching it to green hydrogen could help Latvia meet its EU refuelling duty and build on real cold-climate data.
NEWS
HydrogenLatvia
11/12/20264 min read


Rīga has run hydrogen trolleybuses in daily service since 2020. Now Rīgas satiksme, the city's public transport operator, says its fleet will go mainly electric. The pilot cost €16.1 million, half of it EU money, and in a recent Latvijas Mediji report the company admits hydrogen isn't cost-competitive in its current setup. Fair enough. For Latvian hydrogen ecosystem stakeholders, though, the more useful question is what Latvia does next with a station it already owns.
A working station running on the wrong molecule
The station produces up to 300 kg of hydrogen a day and stores up to 600 kg. It has a 350-bar dispenser for buses, trolleybuses and trucks, and a public 700-bar one for cars. It also makes grey hydrogen, reformed from natural gas, so the climate case was never really tested. And because it was sized for far more demand than ten trolleybuses create, every kilogram carries a heavy share of fixed cost.
Both problems can be fixed. Switch the supply to renewable hydrogen, then bring in users who fill the spare capacity. If it were our call, we'd green the station before anyone buys another hydrogen vehicle for it.
The carbon arithmetic behind the colour of hydrogen
The colour label is shorthand for a large emissions gap. Our indicative estimates, per kilogram of hydrogen delivered:
Grey hydrogen from natural gas reforming (SMR): roughly 10–12 kg CO₂e, counting upstream gas supply.
Electrolysis on the average 2025 Latvian grid: around 8–9 kg CO₂e. Lifecycle trackers put the grid at roughly 155–160 g CO₂e per kWh, and an electrolyser plus compression uses about 55 kWh per kg. On the EU's official direct-emissions basis Latvia's grid looks much cleaner (66 g/kWh in the wet hydro year 2022) and swings with Daugava water levels, so grid-powered electrolysis can land anywhere from about 4 to 9 kg CO₂e per kg.
Electrolysis on dedicated wind or solar: roughly 0.5–1.5 kg CO₂e, mostly the lifecycle footprint of the turbines and panels.
The middle line surprised us. Latvia's grid is around 70% renewable, yet gas-fired winter evenings keep the lifecycle average high, so grid electrolysis ends up only somewhat cleaner than SMR. Deep cuts need a direct link to renewable power.
Now apply that to a trolleybus running off the overhead wire. We assume about 10 kg of hydrogen per 100 km for the fuel-cell range extender, against roughly 40 litres of diesel for a diesel generator. Per 100 km off-wire:
Diesel range extender: about 125–130 kg CO₂e.
Fuel cell on today's grey hydrogen: about 100–120 kg CO₂e.
Fuel cell on grid-powered electrolysis: about 85–90 kg CO₂e.
Fuel cell on renewable hydrogen: about 5–15 kg CO₂e.
On grey hydrogen, the gain over diesel is marginal. At the 16 kg per 100 km logged in the winter bus trial, it would vanish. On renewable hydrogen, the same vehicles cut off-wire emissions by around 90%. The trolleybuses have done their part. The molecule hasn't.
The EU refuelling obligation changes the maths
Under the Alternative Fuels Infrastructure Regulation (AFIR), member states have to provide hydrogen refuelling along the core TEN-T network and in its urban nodes, with 2030 as the main deadline. Rīga is one of those nodes. So Latvia needs public hydrogen refuelling here regardless. It can start from zero, or it can green and open up a station that already has permits, trained staff and six years of operating history.
Seen that way, the surplus capacity stops being a weakness. It's room for logistics trucks, municipal fleets and private cars, which is exactly who a TEN-T station is supposed to serve.
Cold-climate data Baltic fleets can use
Rīgas satiksme also trialled a hydrogen bus, partly in winter, with temperatures down to about −20°C. Any Baltic or Nordic operator should look at the results:
About 960 km driven across different routes.
Average consumption of around 16 kg of hydrogen per 100 km.
Refuelling took about half an hour.
Handling and cabin temperature held up in hard frost. Heating the cabin pushed energy use up noticeably, and that's the real winter variable for every zero-emission bus, battery or hydrogen.
This is local, measured evidence. Any fleet comparison for cold climates should include it.
Buy kilometres, not just vehicles
The bigger obstacle is procurement. Operators usually buy buses in one tender and fuel or energy in another, and several decarbonisation rules name a specific technology, such as battery buses, as the target. Under that setup, hydrogen gets judged on its weakest numbers: high upfront vehicle prices, with all the infrastructure risk left on the operator.
A technology-neutral tender would let the buyer purchase passenger-kilometres as one service, with the supplier responsible for both vehicles and energy. The supplier then carries the utilisation risk and has every reason to keep the station busy. Hydrogen, batteries and hybrids would finally compete on the same terms.
What comes next
Rīgas satiksme plans to buy 60 electric and 60 diesel buses, and the hydrogen trolleybuses will keep running while their condition allows. The station's future is a national decision too. Green it, open it to more users and tie it to Latvia's AFIR obligations, and an expensive lesson becomes a head start.
Source: Miljoni ūdeņraža tvaikos? Rīgas trolejbusu projekts nav attaisnojis gaidas
Grid data: Electricity Maps
